It is now about 5 years, since the operation through the 57 kilometer long Gotthard Base Tunnel (GBT) began and most of the traffic was rerouted from the mountain line. In june 2016, there was "bu... (more)
The upper Reuss valley in the blue hour at 10.18 PM, in a multiple long time exposure. In the foreground the village of Wassen, junction to the Susten pass, in the background the lights of Gösche... (more)